SPD decontamination air needs its own exhaust route

  • Life Sciences
  • 1 min read

A decontamination room can read negative on the BMS while its return air mixes, above the ceiling, with air from the packing room next door.

The cause is a shared plenum: both rooms return through ceiling grilles into the same void, which connects back to one AHU. The pressure sensor compares the room with the corridor, so the screen looks right.

ASHRAE 170, a common design reference for hospitals, is strict about this room. For a sterile processing decontamination room it asks for negative pressure, at least 6 total air changes per hour, and all room air exhausted outdoors with no recirculation. Clean assembly and sterile storage sit positive. Check the table in the edition your project cites, and any local ministry rules on top of it.

On the drawings, follow the decontamination exhaust from the grille to where it leaves the building. It should be ducted the whole way, with no open grille into a void other rooms also use.

At commissioning, open the ceiling above the room and trace that same duct on site. Then try to open both doors of the pass-through washer-disinfector together. The interlock should stop you. Retest it after the first busy months, since busy shifts sometimes bypass it.

Sterile processing departments are among the hospital clean zones in our Life Sciences work.

When was the ceiling void above your decontamination room last opened and checked?

Industries

Related

More on this subject

What to check on every BMS graphic

Operators run the plant from BMS graphics, so errors there become operating errors. Check each screen for five things: every value has a unit and a tag, the setpoint sits beside the actual value, alarm colours follow one convention, stale values look different from live ones, and room names match the room codes.

InsightRead

AHU casing deflection: D1 or D2

EN 1886 classes AHU casing strength by deflection at test pressure: D1 up to 4 mm/m, D2 up to 10 mm/m. On a high-static GMP supply unit, a flexing panel works its gaskets loose and leakage rises. Ask which class was tested, on what model box, and whether your design pressure fits.

InsightRead