The batch record said "granulate to end point", and the operator who knew what that meant stayed at the sending site.
Every file on the transfer list arrives, and the first trial batch at the receiving site still dissolves too slowly. The record gave a mixing time and an impeller speed. It did not say that the sending site stopped by the power reading, on a granulator with a different bowl.
The WHO guideline on technology transfer (TRS 1044, Annex 4, 2022) gives documentation a section and an appendix of its own, and still opens by calling a transfer one of products, processes and knowledge, supported by documentation and professional expertise. The two units and the marketing authorisation holder should jointly establish a team, and on-site or virtual visits at critical phases should be allowed whenever possible. Acceptance criteria for a successful transfer should be documented beforehand in the protocol, so one batch in specification does not get to define success afterwards.
ICH Q10 sets the same goal for technology transfer: to transfer product and process knowledge.
Someone from the sending unit stands at the granulator for the first batches, and someone from the receiving unit has watched the process run at its home site. It costs travel and weeks of two people's time.
Which parameter in your last transfer came with a value and no reason?