Receiving-site readiness, one signed document at a time

  • Engineering Solution & Consultancy
  • 1 min read

On most transfer plans the registration batch date is the one line nobody is allowed to move.

An assessor reads what stands behind the batches made on that date. By the time the first one is dispensed, five things should be true, each with a signed document.

  1. Equipment, utilities and rooms are qualified: IQ and OQ reports approved, laboratory instruments included.
  2. Analytical procedures are transferred and the transfer report is approved.
  3. Material specifications are approved, and so are the suppliers.
  4. The master batch record is approved and issued. A draft with handwritten changes is a development record.
  5. Operators are trained on this process, with records.

WHO's technology transfer guideline (TRS 1044, Annex 4) says the two sites should jointly verify IQ and OQ data, room qualification and cleaning validation. EU GMP Annex 15 (2015) says equipment used for process validation should be qualified and test methods validated, that the batches should be made by trained personnel using approved documentation, and that suppliers of critical materials should be qualified first, or the gap justified by risk. Both are written for transfer and validation batches; the rest of the list, and applying it to registration batches, is our reading.

On a new site the date is really set by construction, because qualification cannot start from an open punch list.

Industries

Related

More on this subject

RPO and RTO for GMP data systems

A nightly backup means up to 24 hours of data can be lost. That is a recovery point objective, RPO, whether or not anyone chose it. The recovery time objective, RTO, is how long the system may stay down. Both should be written down, signed by QA and proven with a timed restore test.

InsightRead

The GMP spreadsheet nobody validated

A spreadsheet that calculates F0, an assay result or an airflow figure is a computerized system under EU GMP Annex 11 once its answer drives a GMP decision. Locked formula cells, one released template under version control and formulas checked once by hand are the minimum an auditor will look for.

InsightRead

The receiving site validates the process again

A process validated at the sending site was validated with that site's equipment, utilities and people. WHO's technology transfer guideline defines validation batches as those produced by the receiving unit, and EU GMP Annex 15 (2015) covers site transfers. The earlier validation supports the new protocol. With bracketing, the number of batches could be reduced; the content of the previous validation should be available.

InsightRead