Supply air leaving a coil at 12 °C and 95% RH reads about 50% RH once it has warmed to 22 °C in the room.
The moisture content stays near 8.3 g/kg and the dew point near 11 °C the whole way. The reading halves only because the air warmed up, which makes a supply-duct RH sensor a poor instrument for most of the jobs it gets given.
While the coil is dehumidifying, a sensor straight after it sits between 90 and 100% for most of the day. That is the top of the scale, where capacitive RH elements are usually least accurate, and a sensor wetted by condensate or carry-over can take a long time to read true again.
For the coil loop, the useful signal is dew point after the coil. At saturation the leaving-air temperature carries almost the same information, 12 °C against a dew point of about 11.2 °C here, and a temperature sensor reads it accurately and does not mind being wet. Reheat and duct heat gain raise the temperature but leave the dew point as the coil set it, so the controller works on the moisture that actually reaches the room.
The duct RH sensor keeps one job. Downstream of the reheat coil the air should read well below saturation. If that reading climbs toward 100%, reheat has failed or droplets are carrying over, and the filters after it are getting wet. That deserves an alarm.
Humiley sizes fresh-air coils for tropical plants on peak dew point.
Which variable does your fresh-air coil actually control on?




