A DX unit that stops its compressor while the fan keeps running can put much of the water it just condensed back into the supply air.
While the compressor runs, the coil sits below the air's dew point. Water condenses on the fins and builds a film before it starts to drain. When the compressor stops and the fan carries on, that film is still there. Return air blows across it and evaporates it back into the supply. Net removal over the cycle falls well short of the catalogue rating, which assumes steady running.
At full load the compressor barely cycles. At part load it does, and in a tropical plant part load means the mild, humid days of the wet season: little sensible heat, plenty of moisture, a compressor stopping and starting. Room RH climbs on the days the room most needs drying.
Comfort systems often avoid this by cycling the fan with the compressor. A cleanroom cannot, since the fan holds the air changes and the pressure cascade. The fix has to be on the refrigeration side: a modulating compressor that keeps the coil cold at low capacity, staged circuits, or a chilled-water coil on a control valve. Some designs hold the coil at a fixed dew point and add reheat, paying energy to hold RH.
It is one way temperate designs fail in the tropics on wet afternoons. We treat dehumidification staging as a primary design decision.
Have you seen RH creep up in a DX-served room during mild, rainy weather?




