Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

129 articles tagged #HVAC.

Decommissioning a room or HVAC system under change control

A room taken out of use without paperwork keeps alarming and keeps printing maintenance tasks. Treat it as a change: assess the neighbouring pressures, archive the final records and monitoring data, isolate utilities and cap ducts, update the asset register, maintenance plan and calibration schedule, and formally retire the monitoring points.

InsightRead

In a fab, the yield report is the slowest sensor

Filtration, AMC control, ±2% RH micro-environments and UHP utilities can each drift without an alarm. Designing facility monitoring with them, measuring at the tool, trending utilities and power on one time base and setting alert limits inside action limits, shows drift before the yield report does.

Read

Zoning and Pressure Cascade

In pharmaceutical facility design, if the HVAC system is the "lungs," then the Zoning and Pressure Cascade strategy is the "immune system." It creates invisible but effective barriers that prevent microbial ingress and strictly control…

InsightRead

In the past, contamination control was often managed in silos: HVAC handled ventilation, Architecture handled walls/ceilings/floors, and QA handled cleaning procedures. But under the updated EU GMP Annex 1, that approach is no longer…

InsightRead

Central Vacuum Cleaning

In GMP audits, scrutiny often lands on Cleaning Procedures. Using portable vacuum cleaners in cleanrooms is a red flag. Why? Because the exhaust turbulence from a portable unit disrupts laminar airflow and can aerosolize settled dust,…

InsightRead