The sending site's process description says "protect from moisture". The room data sheet needs a number.
The HVAC design of a transfer project often starts before that number exists. WHO's technology transfer guideline, TRS 1044 Annex 4, says the sending unit should provide information that includes environmental conditions or any special requirement needed for the facility or equipment, depending on the nature of the product. From there to the data sheet is a short path.
- List what the product and its intermediates are sensitive to: moisture, heat, light, oxygen. Take it from the development and stability data.
- Find where each one is exposed, and for how long. An open granule waiting an hour for the press matters more than a closed bin in a corridor.
- Set temperature and humidity limits for each room where exposure happens. Ask what the sending site's rooms really ran at during the batches behind the data.
- Check containment needs from the exposure limit the sending unit supplies.
- Enter the limits in the room data sheet and the URS, each with the document it came from.
We keep 34 standard pharma Room Data Sheets, and a standard sheet cannot know this product.
The humidity limit is where the money is decided. In a tropical climate it sizes the dehumidification plant, and a limit copied lower than the product needs, "to be safe", is paid for every wet season.
Industries




