Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Life Sciences

Life Sciences

8 articles tagged #WHOGMP.

From Viet Nam to Europe: three registration pathways

A Vietnamese manufacturer can reach the EU market by acquiring a marketing authorisation and transferring the site, by new registration via technology transfer, or by in-house development. All three need an EU GMP site and quality system, an EU-based MAH, a Qualified Person and pharmacovigilance.

InsightRead

Before changing an inherited facility or design, a written gap assessment against the URS and target regulations gives management and inspectors the same picture: evidence from documents and spot measurements, findings graded by risk, and the fix, cost range and schedule impact of each, plus what can stay.

InsightRead

Pharma habits in a battery dry room

In a Li-ion dry room at −60 °C dew point and below, extra air changes do not help: return air often passes back through the desiccant rotor, so more supply air means a bigger rotor and more regeneration heat. Size airflow from the moisture balance; pressure control, airlocks and envelope sealing carry over from pharma.

InsightRead

Grade C through a fab engineer's eyes

To a semiconductor engineer, Grade C at ISO 8 in operation looks loose. EU GMP Annex 1 adds microbial limits: 100 CFU/m³ in air, 50 per settle plate over 4 hours, 25 per contact plate. Rooms wiped with sporicide need floors and joints a fab never had to clean, and a CCS that ties the choices together.

InsightRead

Zoning and Pressure Cascade

In pharmaceutical facility design, if the HVAC system is the "lungs," then the Zoning and Pressure Cascade strategy is the "immune system." It creates invisible but effective barriers that prevent microbial ingress and strictly control…

InsightRead