Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Renewable Energy

Renewable Energy

9 articles tagged #HVAC.

Solar–Wind–BESS: size the auxiliaries one by one

Hybrid renewable sites often size battery cooling from the weather and lump the other auxiliaries into one allowance. Resistive heat in the cells rises with the square of the current, and a 3% loss on a 1 MW discharge is 30 kW of heat. Control rooms, fire and gas safety and site services need their own lines.

InsightRead

Liquid-cooled battery racks move most heat outside, so the enclosure unit looks small on paper. But 18 °C coolant pipes sit inside, and on a wet afternoon outdoor air near 26 °C dew point comes in with every maintenance door opening. Specify an enclosure dew point limit below the coldest pipe.

InsightRead