A full-size 592 × 592 mm bag filter is commonly rated at about 3,400 m³/h, and many filter banks run their frames well above that.
It happens more easily than it sounds. A 20,000 m³/h AHU needs six full-size frames (20,000 ÷ 3,400 is 5.9). A casing drawn around the fan and coil sometimes has room for four, and the filter bank gets what fits. Four frames at 20,000 m³/h carry 5,000 m³/h each, 47% over.
Above its rated flow a bag filter behaves differently in three ways.
- Pressure drop starts higher and climbs faster, so the fan works harder from day one and the filter reaches its final pressure drop sooner.
- Efficiency against fine particles can fall as face velocity rises, so the ISO 16890 rating on the label was measured at a flow the filter no longer sees.
- The pockets flutter and rub against each other, and the seams wear.
The count belongs in the equipment specification: airflow, number and size of frames per stage, and the rated flow per frame from the filter manufacturer's data. It is easy to check at design review and at FAT, and much harder to change once the casing is built.
AeroSano AHUs are engineered from the project's own airflow schedule, and every unit is FAT-witnessed.



