Skip to content

News

Three EN 13053 classes that decide AHU running cost

  • News
  • 1 min read

An AHU quotation shows price, airflow and coil duty. What the unit will cost to run for twenty years is rarely on it.

EN 13053 gives a way to see it. The standard rates air handling units with classes a manufacturer can declare, and three of them carry most of the energy story:

  1. Velocity class (V). Air velocity across the casing cross-section. A lower class means a bigger, dearer casing and lower pressure drop across coils and filters for the next twenty years.
  2. Fan power class (P). How much electrical power the fans draw for the airflow delivered, compared against a reference. This is where motor, drive and fan efficiency show up together.
  3. Heat recovery class (H). How well the unit recovers energy from exhaust air, where recovery is allowed. In many GMP suites it is limited by cross-contamination rules, so check which rooms can use it before you give it weight.

Ask for all three in the specification, declared at the design airflow, and the offers become comparable. Leave them out and the evaluation defaults to capital cost, where the smallest casing looks best and its extra pressure drop only turns up later on the electricity bill.

Regulation (EU) 1253/2014 sets EU ecodesign minimums for ventilation units. It does not bind a plant in Viet Nam, but it makes a useful floor for a URS.

Humiley's AHU selection platform includes an ErP compliance module.

Which of the three do you already ask vendors for?

Related

More on this subject

Set a device assembly room's class from the product's risk

ISO 13485 §6.4.2 asks for documented contamination control without naming a cleanroom class. Setting the class from sterilisation method, patient contact and bioburden sensitivity often lands device assembly at ISO 8, with ISO 7 only where needed, less air than Grade C, a smaller AHU and a reason an auditor can read.

InsightRead

Zoning and Pressure Cascade

In pharmaceutical facility design, if the HVAC system is the "lungs," then the Zoning and Pressure Cascade strategy is the "immune system." It creates invisible but effective barriers that prevent microbial ingress and strictly control…

InsightRead