Moving a room's RH limit from 45% to 30% at 20 °C usually moves the dehumidification plant from a cooling coil to a desiccant wheel.
At 45% the dew point is about 7.7 °C. A cooling coil reaches it, but only with chilled water around 5 °C or a coil selected for a low leaving dew point; standard 6/12 °C water tends to leave the air nearer a 9–11 °C dew point. At 30% the dew point is about 1.9 °C, below what a chilled-water coil can practically dry air to, and the desiccant wheel brings its own capital, energy and maintenance.
That makes the RH limit worth arguing about before anyone sizes plant. EU GMP asks for humidity appropriate to the product and the process and gives no value, and on many projects the gap is filled from the last URS or from a guideline written for a different product.
Product data should set it: how fast the powder or tablet takes up water at a given RH, and how long it sits open in each room. Development often has those curves already. Operators bound it from the other side, since people in full gowns have to work in the room for a whole shift.
Humiley's desiccant units control to ±2% RH and reach −60 °C dew point for processes that truly need it.
Where did the RH limit in your last URS come from?
Industries




