Engineering's part of the product quality review

  • Maintenance Service
  • 1 min read

The qualification-status line is usually the last one filled in on the product quality review.

The 2013 text of EU GMP Chapter 1 says the review should include at least twelve items. One of them reads: the qualification status of relevant equipment and utilities, e.g. HVAC, water, compressed gases. It is one of two items that name equipment, and the rest of this list is how a site makes them believable. A QA lead can send engineering the same request each year:

  1. Qualification status, system by system: date of the last qualification or requalification, what is due, what is overdue. HVAC, purified water, compressed air and nitrogen, and the product's equipment train.
  2. Changes to facility, utilities and equipment in the period, with the change-control number and whether requalification followed.
  3. Excursions and trends: room pressure, temperature and humidity, water conductivity and TOC, compressed-air dew point, by room and system.
  4. Calibration and maintenance failures that touched the product: out-of-tolerance instruments, breakdowns during a batch, and how each was closed. As deviations they are already on the 2013 list.
  5. Status of engineering CAPAs from the last review. The same 2013 list includes the adequacy of previous equipment corrective actions.

Periodic requalification and calibration are part of our maintenance service.

Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)

Industries

Related

More on this subject

EU GMP Chapter 4 expects logbooks for major or critical equipment, recording use, calibration, maintenance, cleaning and repairs with dates and names. For an AHU serving graded rooms that means qualification events, sensor calibration, filter changes with differential pressure, repairs with deviation numbers and cleaning records.

InsightRead

Zero growth and the HVAC record around a media fill

Annex 1 sets zero growth as the APS target, and any contaminated unit fails it. The environmental side of the investigation starts from viable monitoring, with HVAC and EMS trends as support, so review trends before the fill, confirm logging and clock sync, and agree which HVAC events count as interruptions.