Under EU GMP, a batch of a product with a 5-year shelf life keeps its documentation for at least 6 years.
The rule is Chapter 4, paragraph 4.11: at least 1 year after the batch expires or 5 years after QP certification, whichever is longer. With a 3-year shelf life and certification at manufacture, expiry plus one year comes to 4 years, so the 5-year limit governs. At a 5-year shelf life, expiry plus one year reaches 6 and takes over.
QA teams apply this to the batch record as a matter of course. The room data behind the release decision gets less attention. If environmental monitoring, differential pressure trends, particle counts or temperature and humidity from the BMS and EMS were part of that decision, the safer reading is to keep that data for the same period. An inspector reviewing a batch still inside its retention period can ask what the rooms were doing while it was made.
That data usually lives in systems the contractors configured, often on default settings. A BMS historian that overwrites its oldest records to save disk space will have lost the data for a 6-year batch long before the batch record is due to go, and trend exports copied to one engineer's PC last only as long as that PC.
At design stage the fix is cheap: write the retention period into the URS for the BMS and EMS, size the storage for it, and keep the audit trail with the data.
Industries



