Annex 1 dropped the ≥5 µm limit for Grade A classification. It kept one for monitoring: 29 particles per m³.
Teams mix the two up in one direction. The argument goes "ISO removed 5 µm for ISO 5, so we can drop that channel", and the Grade A counters get configured for 0.5 µm only.
The two tables say different things. In Annex 1 (2022) Table 1, the classification table, the Grade A ≥5.0 µm limit is "not specified", at rest and in operation. That follows ISO 14644-1:2015, which stopped setting a 5 µm limit for ISO 5 because counts that low are statistically weak at practical sample volumes.
Table 5, the monitoring table, is another matter. Grade A keeps a ≥5.0 µm limit of 29 per m³, at rest and in operation. And Annex 1 asks you to investigate consecutive or regular counts of low levels of ≥5 µm particles, since in Grade A they can be the first sign of a contamination event, well before anything exceeds 29.
That second rule is the one a disabled channel quietly breaks. An alarm limit catches the excursion. Only a trend catches three single counts a shift, every shift, for a week.
When we write the monitoring section of a Contamination Control Strategy, the 5 µm channel gets its own alert level, its own action limit and a trend review with an owner.
Industries




