If a humidity transmitter has drifted 2% low, a room the BMS shows at 45% RH is really at 47%.
The trend is flat, the alarm is quiet, and the room is already on the edge of its band. Capacitive RH sensors drift with age, contamination and long spells at high humidity, and none of that shows on a control screen. The controller holds whatever the sensor tells it.
So a tight band needs a sensor, a reference and an interval that match it. What we look at:
- The sensor's stated accuracy against the band. A transmitter specified at ±2% RH in a ±2% RH room leaves the loop nothing to prove. The reference used to calibrate it has to be tighter again.
- The calibration point. Check at or near the setpoint the room actually runs at, not only at a convenient mid-scale value.
- The first interval. Start short, then lengthen it on the evidence of as-found results.
- The as-found reading. Record it before anyone adjusts the sensor. It is the only number that tells you whether the room was in band last month.
Our desiccant dehumidification is specified to hold ±2% RH, and our maintenance teams carry out periodic requalification and calibration. We treat the band and the calibration plan as one decision.
Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)




