An airflow diagram is one sheet, and most pressure cascade errors are visible on it before anything is built.
It shows every room as a box with its supply, return and exhaust flows, and every AHU with what it delivers and takes back. That is enough for arithmetic. An hour with a calculator finds what would otherwise show up during balancing.
- For each room, supply minus return minus exhaust is the net leakage: air out through the doors, less air in from higher-pressure neighbours. Sign and size have to fit the cascade.
- Room supplies add up to the AHU supply, and return plus fresh air equals supply. Fresh air covers the exhaust plus the leakage that leaves the building.
- Every filter stage is drawn with its class, at the AHU and at the terminal.
- Each damper, flow station and pressure sensor carries a tag that is in the instrument list.
- The room pressures printed on the diagram match the cascade drawing and the room data sheets, room by room.
The room sum is where most of it shows. A room marked +30 Pa, the highest in the suite, with supply equal to return has no air left to leak out, and no amount of balancing will produce the pressure. The same sum exposes a corridor that receives leakage from six rooms and has nowhere to send it.




