Skip to content

Manufacturing & Distribution

Commissioning a variable-speed drive on an AHU fan

  • Manufacturing & Distribution
  • 1 min read

A drive left on factory defaults will run an AHU fan. After a half-second power dip it may not get the fan back.

When the supply returns, the wheel is still spinning near full speed. A drive that starts from zero into a spinning motor sees a current surge or an overvoltage on its DC bus and trips. The room loses its pressure cascade until someone walks to the plant room. The function that prevents this, usually called flying start, is switched off in many default sets.

Set the drive up in this order:

  1. Enter the motor nameplate data: voltage, current, frequency, speed and power.
  2. Run the drive's motor identification.
  3. Set minimum and maximum speed and the ramp times. A large wheel needs a long ramp down, or the drive trips on overvoltage while the fan drives the motor.
  4. Sweep the speed range and listen. Where the casing or the frame resonates, set a skip band around that speed.
  5. Decide and test what happens on power loss, on loss of the speed signal and in fire mode: restart or wait, hold the last speed or go to a fixed one, which trips fire mode overrides. The answers come from the control narrative.

Then, with the fan at speed, open the supply for a second and watch the drive.

Save the final parameter list in the equipment file. A replacement drive fitted at 2 a.m. starts on defaults again unless that list exists.

Related

More on this subject