Skip to content

Life Sciences

Class II A2 or B2 biosafety cabinets and the room air balance

  • Life Sciences
  • 1 min read

A Class II type B2 biosafety cabinet sends all of its air to the building exhaust, and the room has to supply every cubic metre of it.

That is the main difference from a type A2, and it shows up in the HVAC more than at the bench. An A2 recirculates most of its downflow through its own HEPA filter and exhausts the rest, around 30%, either back into the room through an exhaust HEPA or into a canopy connection with an air gap. A B2 is hard-ducted and recirculates nothing.

With an A2 on a canopy the room hardly notices the cabinet. The building exhaust draws slightly more than the cabinet discharges, the gap absorbs fluctuations, and switching the cabinet off barely moves the room balance.

The B2 exhaust flow is large and usually has a dedicated fan, so when the cabinet is switched on or off the room supply has to follow or the cascade shifts. If that fan slows, the cabinet loses inflow at the front, so it needs an alarm and an interlock that stops work. Supply and exhaust controls are tuned together and tested with the cabinet running.

B2 is chosen for work with volatile toxic chemicals alongside the biological agent. Without that need, an A2 is far simpler to live with.

We design cell culture suites with the cabinet list inside the air balance from the first schedule.

Was your suite's balance tested with every cabinet running?

Industries

Related

More on this subject

Central Vacuum Cleaning

In GMP audits, scrutiny often lands on Cleaning Procedures. Using portable vacuum cleaners in cleanrooms is a red flag. Why? Because the exhaust turbulence from a portable unit disrupts laminar airflow and can aerosolize settled dust,…

InsightRead

Containment exhaust fans, stacks and intakes

Put containment exhaust fans at the end of the run so ducts inside the building stay negative. Run duty and standby with isolation dampers and alarmed changeover, discharge vertically with height and velocity from a standard or a dispersion study, and keep the plume away from fresh-air intakes.

InsightRead