Holding a whole fab to ±2% RH means dehumidifying, reheating and filtering every cubic metre of the bay to what the wafer needs.
Most of that air never touches a wafer. The product sees the air inside the tool, the pod and the loadport. A micro-environment gives that small volume its own filtered air and its own humidity and temperature control, with AMC filtration where the process needs it, and leaves the room on a looser band chosen for people and equipment.
The design question is where the room band sits, because room air gets into the enclosure. Take an illustrative enclosure of about 2 m³ with 1 m² of filter face at 0.4 m/s. It moves 0.4 m³/s and replaces its own volume every 5 seconds, so it recovers fast after a door or pod opens, provided its supply air is at setpoint. The harder case is steady leakage at the edge of the room band. If the room is held at 45% ± 5% RH and the enclosure at ±2%, its conditioning has to be sized for room air at the top of the band: 50% RH at the highest room temperature allowed.
That interface between the tool vendor's enclosure and the facility HVAC is where start-up surprises tend to sit, so both specifications should state the room band the enclosure is designed for.
Our semiconductor work covers ISO Class 1–3 cleanrooms, HEPA and ULPA filtration, AMC control and micro-environment control to ±2% RH.
Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)
Industries



