Dry air leaves the rotor hot: plan the post-cooling

  • Manufacturing & Distribution
  • 1 min read

Air leaving a desiccant rotor is drier than when it went in, and noticeably warmer.

Two things heat it. Adsorption releases heat as the desiccant takes up water, roughly the latent heat of the moisture removed turning into sensible heat. And the rotor carries heat across from the hot regeneration sector as it turns. A lower target dew point means more water removed and often a hotter regeneration sector, so the temperature rise grows with it.

That puts a lot on the post-cooler. Size it on the rotor leaving temperature at full dehumidifying duty, and not on the room setpoint plus a rule of thumb. The air reaching it is already far drier than anything its surface could condense, so the selection is sensible-only and the coil runs dry.

Control follows the same split. Room temperature is held by the post-cooler and humidity by the rotor, each on its own sensor, and the temperature loop should never be allowed to reach for the rotor when the room is warm.

Check the chilled water early. A plant designed around comfort-cooling water may not reach the leaving air temperature the post-cooler needs. And give the coil access and cleaning like any other coil in the supply path.

When this goes wrong, the room typically holds its dew point perfectly and runs two or three degrees warm every afternoon.

Humiley's desiccant dehumidification controls to ±2% RH, and we would select the post-cooler together with the rotor.