Skip to content

Manufacturing & Distribution

Engineered AHU or catalogue unit: choosing per area

  • Manufacturing & Distribution
  • 1 min read

A catalogue AHU is selected to the nearest frame size. Your airflow schedule was never written to one.

In an office zone or for a like-for-like swap in a running plant, that rarely matters. A unit from a major range arrives sooner and comes with published performance data, and its spares sit on a distributor's shelf.

It matters wherever room humidity is specified. Take a Grade C room held at 20 °C and 45% RH. Its dew point is about 7.7 °C, so the air leaving the cooling coil has to be drier than that, with margin for people and door openings. A range coil can meet the total kW on the selection sheet at the catalogue rating condition and still leave the air too wet on a humid afternoon. The frame was picked on airflow, and the coil came from whatever rows and fin spacing the range offers. Before approving a selection, ask for the leaving-air dew point at your site's peak dew-point condition.

An engineered unit starts from the project's own airflow schedule and load calculation, so coil, casing and hygienic details are sized to the room. It costs time in approval drawings and fabrication, and some spares are specific to the unit.

AeroSano units are engineered to the project, and we supply range equipment, filters and dehumidifiers from established manufacturers including Camfil, Daikin, Carrier and Munters.

Related

More on this subject