EN 10204 3.1 or 3.2, and the heat number that has to survive the cut

  • Manufacturing & Distribution
  • 1 min read

A 316L spool that reaches IQ without its heat number matches no certificate in the file, 3.1 or 3.2.

That is why the certificate type matters less on site than the marking. Transfer the heat number to every piece before the cut and record it on the weld map, and the paper trail survives fabrication.

The type still has to be chosen at purchase. Under EN 10204, both a 3.1 and a 3.2 report actual test results on the material delivered, traceable to the heat. A 3.1 is issued by the manufacturer and validated by its authorised inspection representative, who must be independent of the manufacturing department. A 3.2 is also signed by an inspector appointed by the purchaser, or designated by official regulations, who witnesses or checks the tests.

That second inspector has to be booked and the tests arranged around the visit, so a 3.2 adds cost and lead time. Ask for it where the URS or the client's QA wants third-party verification of product-contact parts, or where the design code applied to a particular pressure part calls for it. Which code, and for which parts, depends on the project. For hygienic AHU components and 316L piping, a 3.1 matched to a heat number marked on the part is what is commonly specified and what IQ checks.

In AeroSano production, material certificates go into the equipment file while the unit is built.

Related

More on this subject

What a witnessed AHU FAT actually checks

EN 1886 class L2 allows an AHU casing 0.44 l/s per m² of leakage at −400 Pa. On a witnessed FAT, casing leakage, fan airflow at design static pressure, filter bypass and the control panel are checked against the approved specification, and both engineers sign the sheet that goes into the equipment file.