Steam that has not absorbed before it reaches a filter leaves it wet. In a GMP air handler that is a microbial problem.
Every steam dispersion system has an absorption distance: the length of duct or casing the visible steam needs before it is fully absorbed into the air. It depends on air speed, air temperature, steam load and the dispersion design, and the manufacturer calculates it for your conditions. The layout problem is that AHU sections come in fixed lengths and the humidifier often gets whatever space is left.
What we check before a humidifier section is accepted on the drawing:
- Absorption distance from the maker, at this unit's air velocity, temperature and maximum steam load, not a catalogue value.
- Nothing wet-sensitive inside that distance: filter, fan, coil, damper, bend or the RH sensor itself.
- A stainless drain pan under the dispersion section, sloped and trapped, because some condensate will form.
- An access door and a viewing window to inspect the manifold.
- A high-limit humidity sensor downstream of the absorption zone to stop the humidifier before it saturates the duct.
A short absorption distance usually costs more: a multi-tube manifold or a longer section. It is cheaper than replacing a wet HEPA.
Our AeroSano units are built from the project's own airflow schedule and load calculation, so the humidifier section is sized in the casing, not squeezed in later.



