Skip to content

Semiconductor Industry

ESD on device lines fails where controls meet

  • Semiconductor Industry
  • 1 min read

A dissipative floor can pass its test and the heel grounders can pass theirs, while the operator standing on both still charges up.

On device assembly lines, ESD control tends to fail where two controls meet, because each is checked on its own. The floor gets a resistance-to-ground reading at handover. Footwear gets a pass at the entry tester. The path that matters, person through footwear through floor to ground, often has no test at all.

IEC 61340-5-1 and ANSI/ESD S20.20 treat that path as a system. A wrist strap system has to measure below 35 MΩ from the person to ground. Footwear and flooring can be qualified as a pair the same way, with a combined resistance test and a walking body-voltage test, at each station and with the shoes operators actually wear.

The other joints need the same thinking. An ioniser covers the insulators that cannot be grounded until its emitter points foul and its balance drifts, which a charged plate monitor on a schedule will show. Garments lose conductivity in the laundry, so their resistance test belongs after a set number of wash cycles. Humidity sits with the HVAC: agree the RH band with the device team, since charge builds faster in dry air, and keep it on the trend.

Particulate and ESD control for device assembly is part of our medical device work.

Related

More on this subject

EU GMP Chapter 3 and 21 CFR 211 on HVAC

21 CFR 211.42 and 211.46 and EU GMP Chapter 3 ask for adequate ventilation, air control and filtration, but give no air change rate or pressure differential, and no filter class beyond HEPA for aseptic areas. Those come from Annex 1, FDA's 2004 aseptic guidance, ISO 14644 and the designer's justification, recorded in the design basis.

InsightRead