Assembly or packaging: which room sets the device cleanroom class

  • Semiconductor Industry
  • 1 min read

The sterile-barrier packaging room is often the cleaner of the two, even though assembly looks like the dirtier job.

In many device plants, assembly and final packaging share one hall and one ISO 14644-1 class chosen for the whole floor. That is simple to build. It is rarely right for both steps.

Look at what each step exposes. Assembly handles parts that may still go through cleaning, inspection or a functional test afterwards, so some of what they pick up there can still come off. Packaging is the last time the device sees room air. Whatever sits on it when the pouch or tray is sealed goes through sterilisation with it, and the cycle was validated against a bioburden that assumed that room.

So the step that exposes the product last before sealing usually sets the class. Assembly can often sit a step looser and carry its own controls: ESD flooring and grounding for electronic devices, humidity high enough that static does not build, local extraction where parts are trimmed or bonded.

It depends on the device. With no cleaning step between assembly and packaging, both rooms carry the same risk and belong in the same class. That call comes out of the risk assessment, not the floor plan.

Humiley designs device assembly areas with particulate and ESD control and classifies each room from what it exposes.

Related

More on this subject

ISO 13485 §6.4.2 asks for documented contamination control without naming a cleanroom class. Setting the class from sterilisation method, patient contact and bioburden sensitivity often lands device assembly at ISO 8, with ISO 7 only where needed, less air than Grade C, a smaller AHU and a reason an auditor can read.

InsightRead

Energy savings and the requalification bill

Energy measures that change validated cleanroom conditions go through Annex 15 change control. Classification alone can mean 10 sample locations for a 50 m² room, at rest and in operation, before recovery tests and a CCS update. Price that next to the kWh, or design reduced modes in and qualify them once.

InsightRead