One electricity meter at the incomer tells a GMP plant what its HVAC costs in total, and nothing about which AHU is spending it.
A metering plan decides what any later saving is measured against. Four kinds of meter carry most of it.
- A chilled-water energy meter on each AHU coil, measuring flow and supply and return temperature. It shows the cooling each unit really draws against its design load, and in the wet season how much of it goes into drying fresh air.
- Fan power per AHU, from the drive or a kWh meter. Read against airflow, it shows filters loading and fans drifting off their duty point.
- Reheat energy, electric or hot water, per unit or per zone. Reheat after an overcooled coil is energy paid for twice, and in a tropical plant it can be a large share of the HVAC bill.
- Chiller plant power and total chilled-water energy, logged together. Their ratio is the plant efficiency as it actually runs, part load included.
Log everything to the BMS at a fixed interval and keep at least a year. A baseline has to include a dry season and a wet one before anyone claims a saving.
Most of these meters sit outside the qualified room parameters, so they can usually go in under engineering change control without requalifying rooms.
Our energy modeling targets a 30% reduction in HVAC energy, and a model can only be checked against meters like these.