Skip to content

News

Fresh air has to carry the room's latent gain

  • News
  • 1 min read

With 300 L/s of fresh air and 220 W of latent gain in the room, the fresh air must arrive about 0.24 g/kg drier than the room air.

Halve the fresh air and that doubles. In a staged system the recirculation coil runs dry, above the room dew point. It removes heat and no moisture. That leaves the fresh air as the only stream drier than the room, so it has to absorb every gram of moisture the room produces.

The arithmetic is short. Latent load in watts = 3010 × airflow in L/s × humidity ratio difference in kg/kg. Four gowned operators standing at light work give off about 55 W of latent heat each (the ASHRAE row for standing, light work), 220 W together. 220 / (3010 × 300) ≈ 0.00024 kg/kg, or 0.24 g/kg.

At 150 L/s the fresh air has to be 0.49 g/kg drier than the room. That means a lower dew point off the fresh-air coil, a colder coil and more reheat, all to carry the moisture of the same four people.

Cutting outdoor air to save energy therefore needs a humidity check. It saves cooling on a hot afternoon and can leave the room unable to hold its RH setpoint with a full crew. Add the latent sources people forget, such as open vessels, wet cleaning or a sink, and the margin shrinks further.

Humiley sizes the fresh-air coil on peak dew point for this reason.

Related

More on this subject