Skip to content

News

Frost point and dew point: two numbers for the same dry air

  • News
  • 1 min read

Two instruments on the same dry room read −40.0 °C and −43.7 °C, and both are right.

One reports frost point, the other dew point.

Dew point is the temperature at which air becomes saturated over liquid water. Frost point is the same idea over ice. Above 0 °C only the first exists. Below 0 °C both can be stated, because water vapour is in equilibrium with ice at a lower pressure than with supercooled water at the same temperature. For a given amount of moisture, the frost point is the warmer number.

The gap grows as the air gets drier: about 1.2 K at a frost point of −10 °C, 3.7 K at −40 °C, and between 4 and 4.6 K at −60 °C, where the published formulas for supercooled water no longer agree.

A chilled mirror reads whatever has formed on the mirror, and at dry-room conditions that is frost. Many capacitive transmitters report dew point above 0 °C and frost point below it under one label, and some can be set either way.

So "−40 °C dew point" in a specification can be read two ways, more than 3 K apart. Name one in the URS, with its conversion formula, or the dehumidifier gets sized to one reading and tested against the other.

Related

More on this subject