Two copies of the same AHU selection spreadsheet can disagree on the leaving-air moisture content by a few tenths of a gram per kilogram.
In a design review that difference swallows the discussion. Someone has to find out whose macro was edited, and by the time they do, nobody has asked whether the design point was the right one.
Humiley's engineers have a web-based AHU selection and configuration platform built around one psychrometric engine, with an ErP compliance module in the same selection. A junior and a lead who enter the same design point get the same coil, so a lead reviewing a junior's selection can spend the time on the inputs. Those are where selections go wrong: whether the fresh-air coil was set by the dehumidification dew point or the cooling dry bulb, whether the room latent load counts people, open product and wet cleaning, whether the fresh-air fraction matches the airflow schedule, and whether the off-coil condition meets the RH limit in the URS.
We file the platform under Innovation, one of our five values.
Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)




