Skip to content

Careers

Hiring: HVAC and electrical engineers

  • Careers
  • 1 min read

Four 4 kW EC fans on one AHU draw about 27.2 A, and the harmonic study for that fan wall ends with a single 25 A active filter module.

The steps in between are the sort of problem our electrical engineers work through. The six-pulse rectifiers inside EC fans put 5th, 7th, 11th and 13th harmonics onto the supply. Even with a DC choke, current distortion typically sits at 35–42%, far above our design target of THDi ≤ 5% at the point of common coupling (IEEE 519-2022 itself sets TDD limits by short-circuit ratio). Sizing the filter means working out how many amps of harmonic current have to be cancelled, with or without chokes, and leaving a margin. For this fan wall that lands on one 25 A module; a wall of eight fans may need two running in parallel.

We are hiring HVAC and electrical engineers in Ho Chi Minh City. HVAC engineers get the same kind of sum on the air side, from coil loads to fan duty.

New engineers start with fundamentals and then learn on live projects, with a skills matrix and an Individual Improvement Plan to show what they have covered.

Current roles at Humiley

Related

More on this subject

Why we grow our own cleanroom engineers

More than 20 interns joined Humiley's 12-month structured internship in its first year. Training designed with lead engineers from the USA covers fundamentals, on-the-job mentoring, GMP, validation and project management, with a skills matrix and improvement plan for every engineer from junior to lead.

Read

Inside the role: cleanroom HVAC design engineer

Cleanroom HVAC design means load calculations where moisture often outweighs heat, pressure cascades typically 10–15 Pa between grades, coils sized for wet-season dew points, BIM coordination and a paper trail for every airflow. Humiley trains graduates through a skills matrix and a 12-month internship program.

InsightRead

Every Humiley engineer has a Performance Appraisal Development Review twice a year, built on their skills matrix and Individual Improvement Plan. It records which competencies moved, the work that shows it and the plan for the next six months, so progression from junior to senior to lead has evidence behind it.

InsightRead