A fan duty written into a load calculation meets its FAT months later, and that is where a missed pressure drop shows up.
The path is longer than it looks. Airflow and the pressure drops of filters, coils and ductwork fix the fan duty. The duty goes into the AHU schedule, the vendor answers with a submittal and a fan curve, and at FAT the built unit is run to see whether it delivers that airflow against that static pressure. Leave one filter stage out of the sum and the fan comes up short on the test bench, long after the calculation was checked and signed.
A graduate on a placement of a few weeks sees the calculation and is gone before the unit reaches the test bench.