Skip to content

News

One fresh-air unit dries the zone

  • News
  • 1 min read

When one fresh-air unit does all the drying for a cleanroom zone, the humidity in every room depends on that single unit.

It is still the arrangement we prefer for most GMP suites. The room AHUs run their coils warm enough to stay above the room dew point, so they stay dry and handle sensible heat only. The fresh-air unit (FAHU) removes the moisture that people, open product and wet cleaning add, by supplying air slightly drier than the rooms need. The price is that a problem at the FAHU shows up in every room at once.

So most of the design attention belongs on that one unit. Size its coil for a humid wet-season afternoon, on the coincident wet-bulb condition, because in southern Viet Nam the hottest dry-season hour is rarely the hardest hour for latent load.

Control it on the dew point leaving the coil and use room RH only as a trim. A loop that chases room RH reacts after the moisture is already in the rooms.

Then write down what happens when it stops. A standby fan, a second coil circuit and two smaller units each cover a different failure, and the right one depends on how long the product tolerates high humidity. That answer belongs in the design basis, next to the room RH limits, and the off-coil dew point sensor deserves calibration as a critical instrument.

Related

More on this subject