A US HEPA rated 99.97% at 0.3 µm and an EN 1822 H13 rated 99.95% were not tested on the same particle size.
EN 1822 first finds the particle size at which the filter media is weakest, the most penetrating particle size, and rates the filter there. For glass-fibre HEPA media that MPPS usually sits between 0.1 and 0.25 µm. H13 must stop at least 99.95% at MPPS, H14 at least 99.995%.
US practice, following IEST-RP-CC001, quotes efficiency at a fixed 0.3 µm. A Type A HEPA must reach 99.97% there. Since 0.3 µm is larger than the MPPS of most glass-fibre media, the filter performs better at 0.3 µm than at its weakest point. The same filter scores higher on the US test than it would on EN 1822.
So 99.97% at 0.3 µm is not "between H13 and H14", even though the numbers look that way. It is a different test, and a datasheet that mixes the two cannot be compared line by line.
When a submittal lists a HEPA, three questions settle it: which standard, at which particle size, and is there an individual scan test certificate per filter. After installation, the aerosol leak scan checks the filter, the gasket and the frame together, which is the result the room depends on.
Topics




