A surgical lamp swung over the table can leave the wound in its wake, under a ceiling that delivers clean unidirectional air.
A HEPA canopy protects the operating field only where the clean column reaches it. We see two ways that goes wrong.
The first is coverage. A canopy drawn to cover the table alone leaves the instrument trolleys, and the scrub nurse's hands over them, in mixed room air outside the column. Draw the canopy from the surgical layout, table and trolleys together.
The second is whatever hangs in the flow. Lamp heads, pendants and monitor arms sit between the filters and the wound. Air splits around a wide, flat lamp head and leaves a slower, recirculating zone below it, which is where the incision is.
Neither shows in a room average. A smoke study does, with the room set up as for surgery: lamps in their working positions, trolleys in place, people standing where they stand, smoke released at the wound site and filmed. Smoke that hangs or rolls back over the table means the canopy or the lamp has to change.
Filters are typically H13 or H14 to EN 1822 (at least 99.95% and 99.995% at MPPS), leak-tested after installation; class and air changes come from the governing national or hospital standard.
Humiley designs hospital clean zones, operating theatres among them, with pressurisation engineered as infection control.