One water result reads 1.4 µS/cm against a site specification of 1.3 and is investigated. Another reads 1.1 and is filed as a pass.
For a year that second sampling point had read between 0.6 and 0.7. The 1.1 is inside the specification and far outside the pattern, and it may say more about the loop than the 1.4 does.
The first result is OOS, out of specification. The FDA guidance on investigating OOS results (2022) uses the term for any test result that falls outside the specifications or acceptance criteria, and says the first phase of the investigation should include an assessment of the accuracy of the laboratory's data, where possible before the test preparations are discarded.
The second is OOT, out of trend. Neither that guidance nor EU GMP defines the term. In common use it is a result within the limits that does not fit what earlier results lead you to expect. EU GMP Chapter 6 says some kinds of data should be recorded in a manner permitting trend evaluation, and any out of trend or out of specification data should be addressed and subject to investigation.
Catching the 1.1 takes a trend chart for that point and a rule for a break, written down before the data arrives.