Almost every deviation SOP gives 30 days to close. EU GMP Chapter 1 (2013 text) gives no number of days, and neither does 21 CFR 211.192.
Chapter 1, in that 2013 text, lists among the basic requirements of GMP that significant deviations are fully recorded and investigated with the objective of determining the root cause, and that appropriate corrective and preventive action is implemented. 21 CFR 211.192 says an unexplained discrepancy shall be thoroughly investigated and a written record made.
The 30 is usually traced to two US texts of 1993. An FDA inspection guide for quality control laboratories says failure investigations should be performed within 20 business days. A court opinion of the same year on out-of-specification results is cited for thirty, also in business days. Both were about laboratory failures.
So the limit is the site's own, and an inspector will hold the site to it.
With one clock for everything, a mislabelled bin and a failed filter integrity test get the same 30 days, although the same 2013 text says the level of root cause analysis can be determined using quality risk management principles. On day 28 the hard one tends to close as "human error, retrained".
The alternative is also a site rule: a limit per risk class, and an extension only with a written reason and an interim risk assessment.