Both doors of a pass box open at the same moment is the one state its interlock exists to prevent.
The interlock is the reason the box exists. Open one door and the other stays locked until the first is shut again, so air from the lower-grade side never gets a straight path into the higher-grade room. Take the interlock away and you have two doors and a shelf.
What gets less attention is what the operator sees. Each side needs its own indicator, a lamp or a small panel saying the other door is open or the box is in use, so the person waiting knows why the door will not open and does not simply pull harder. On a dynamic pass box with its own fan and HEPA, the indicator should also show when the purge time after closing has run and the clean-side door is released.
Then decide what happens when the power fails. Electromagnetic locks that release on power loss let both doors open. Locks that hold on power loss can trap material inside. Either can be right for a given room, but it should be a documented decision in the risk assessment and tested at OQ with the power actually removed.
Pass boxes are part of Humiley's cleanroom equipment range, and every unit is FAT-tested and witnessed, which is a good moment to cut the supply and watch the locks.
Talk to an engineer: contact@humiley.com, +84 28 7777 6668 (Viet Nam office).