An AHU rarely fails without warning. Usually the warning was in the BMS data and nobody was trending it.
Four signals are worth trending on every critical unit:
- Filter ΔP. A steady rise is normal loading. A sudden drop on a filter bank is not good news: it can mean a torn filter or a seal that has let go.
- Fan speed or power at constant airflow. A variable-speed fan holding fixed airflow speeds up as system resistance rises: filters loading, a damper drifting, a coil fouling. The trend tells you which way the system is heading before the airflow alarm does.
- Bearing condition. Vibration and bearing temperature trends show degradation well before a bearing fails.
- Coil performance. Watch the valve position needed to hold the supply condition. A chilled water valve sitting wide open to hold the same set point is telling you something about the coil or the water.
Most of these signals are already in a modern BMS. Vibration may need a sensor or a route-based survey. What is usually missing is the trending, the alert limits and a named person who looks.
In a GMP plant the payoff is more than avoided downtime: caught as a trend, a failure is planned work under change control rather than a deviation mid-batch.
Condition monitoring and IIoT trending are part of our maintenance service.
Industries



