Skip to content

News

Six points on one psychrometric chart

  • News
  • 1 min read

Six points on one psychrometric chart: outdoor air, mixed air, coil leaving, after the supply fan, after reheat, and the room.

Plot them in order and join them up.

The mixed-air point has to sit on the straight line between outdoor and return air, at the proportion set by the two airflows. Anywhere else, an airflow or an upstream state is wrong.

The coil-leaving dew point has to sit below the dew point the room needs, with enough margin to absorb the room's own latent gains from people and process. At exactly equal, the room drifts above its target. If the coil-leaving dew point is higher still, no amount of reheat brings the room humidity down.

If the coil leaves the air far drier than that margin needs, the design over-dries. It pays for that twice: once in cooling, again in the reheat that follows.

The fan adds heat wherever it sits; between the coils, it moves the point right before reheat. Ignoring fan heat oversizes the reheat, asking it for a temperature rise the fan has already delivered.

The outdoor point should be the wet monsoon afternoon, with its high dew point. A chart drawn from the hottest dry-bulb day shows a coil that looks fine and is not.

Our AHU selection platform has a psychrometric engine that does this for every unit. For a design review, it is still worth having someone who did not run the calculation draw the chart by hand.

Which of the six points do you see go wrong most often?

Related

More on this subject