Eight 4 kW EC fans on one AHU need 2 × 25 A active harmonic filter modules, running in parallel as master and slave.
The sizing starts from the four-fan case. A 4 × 4 kW fan wall draws about 27.2 A of fundamental current. Each EC fan has a 6-pulse rectifier, so the 5th, 7th, 11th and 13th harmonics are large: THDi of 35–42% with a DC choke, 65–75% without. Against a design target of THDi ≤ 5% at the point of common coupling, Humiley's sizing note puts that wall on one 25 A module. IEEE 519-2022 itself sets current-distortion (TDD) limits that depend on the site's short-circuit ratio, and the study checks the design against them.
Double the fans and the fundamental doubles to about 54.4 A. The sizing note then goes to two 25 A modules sharing the load. The master measures the load current and sets the compensation, and the slave follows its lead. Depending on the product, the pair may also keep partial filtering running if one module trips.
Three items belong in the specification: harmonic data from the fan supplier, DC chokes on every fan, and active filtering decided from a harmonic study rather than a rule of thumb. In Viet Nam the study also answers Circular 05/2025/TT-BCT.
That is how we approach EC fan walls on our AHUs.
Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)




