In a plant room at 32 °C and 70% RH, any casing surface colder than about 26 °C will sweat.
That is the dew point of the room air, and the cold sections of an AHU test it all through the wet season. Where the casing frame bridges the insulation, the outside skin runs colder than the panel around it.
EN 1886 grades that with the thermal bridging factor kb. TB1 is kb 0.75 and above, TB2 covers 0.6 to 0.75, TB3 covers 0.45 to 0.6. The higher the number, the closer the worst spot on the outside stays to room temperature.
A rough check with 12 °C air in the cooling section: the coldest outside spot sits at about 12 + kb × 20. Across TB3 that gives 21 to 24 °C, all below 26 °C, so a TB3 frame drips. TB2 spans 24 to 27 °C. The bottom of the class sweats, and the top clears the dew point by about one degree, which a door seal or a cable penetration can use up. TB1 starts at 27 °C.
So the class alone does not answer the question. Ask for the tested kb value, check the cold sections against the plant room's design dew point, and decide whether to buy a better casing or dry the plant room. Which costs less depends on the room. The datasheet value is also measured on a test box; doors and penetrations on a real unit do worse.
AeroSano AHUs are engineered from each project's own airflow schedule and load calculation, for the climate they are built in.