Inspectors walking a cleanroom area tend to ask for the same seven HVAC documents, and every one of them can be indexed before the visit.

The site nearly always has them. The time goes on finding the signed revision in a shared drive while the inspector waits.

For the cleanroom and HVAC side, the requests are predictable:

  1. The HVAC qualification report (OQ/PQ) for the area, with its deviations
  2. Differential pressure trends for a named period, plus the alarm and acknowledgement log
  3. HEPA installed leak test results and the filter change history
  4. Classification and recovery test reports
  5. Smoke study videos for the Grade A zones
  6. As-built drawings: air flow diagram, pressure cascade, zoning
  7. Change controls raised on the HVAC since the last requalification

Put them in one index per area. Room number down the side, document type across the top, and in each cell the document number, revision and controlled location. A runner then goes from request to document in minutes, and the scribe can log exactly what was handed over.

Build the index from the room data sheets and the system boundaries, so an inspector's room-by-room walk matches the way the evidence is filed.

On our projects every decision is traceable from requirement to calculation, drawing and test, which is what makes an index like this quick to fill.

How long did the last request of this kind take at your site?

Industries

Related

More on this subject

Value engineering after tender: savings that return at OQ

After an over-budget cleanroom HVAC tender, three savings recur: an EN 1886 L2 casing instead of L1, fewer room pressure transmitters, and deleted door drop-seals. Each can reappear as an OQ failure in airflow, alarm testing or pressure differentials, so check every line against its URS requirement and test before accepting it.

InsightRead