In a tropical plant a fresh-air AHU's cooling coil is wet most of the year, and the casing after it stays damp up to the reheat.
That wet zone is short: the coil section, its drain pan, the droplet eliminator if one is fitted, and the panels between the coil and the reheat. Cleaning agents are used most there, and a drain pan that holds water is a microbial risk. Stainless steel earns its price there. Use 316 when chlorine-based agents are in the cleaning plan, because chlorides pit 304, and give the pan a fall to the outlet so it drains empty.
Upstream of the coil the casing carries outdoor air through filters, and after the reheat the air is well above its dew point. A fan section, a pre-filter section or a mixing box in coated galvanised steel can last the life of the unit in those positions, provided the coating is continuous at cut edges and fixings. The damage found there is usually an installation scratch nobody touched up.
Writing "stainless throughout" pays for stainless in sections that never see condensate. A schedule that gives material, finish and the cleaning agent for each section usually costs less, and it tells the fabricator which welds matter most.
For every stainless section, ask for the weld and passivation records. On AeroSano units they go into the equipment file during production, so IQ starts with them in hand.




