Skip to content

Life Sciences

Temperature mapping: put the loggers where the risk is

  • Life Sciences
  • 1 min read

On a 7.5 m rack, the pallet at eye level is rarely the warmest one in the warehouse.

Heat collects under the roof. Air near a dock door swings with every truck. The rack next to a cooling unit sees cold air blowing straight at the product. A temperature map with loggers at eye height on each aisle measures the easy part of the building and misses the parts that decide whether product stays inside its label condition.

WHO guidance on temperature mapping (TRS 961, Annex 9, Supplement 8) expects loggers placed in three dimensions and in the places where temperature is most likely to go out of range. In a racked warehouse that usually means top, middle and bottom levels; dock doors and loading bays; under the roof and near sun-facing walls; next to cooling units and air outlets; and the dead corners where air barely moves.

The map then tells you where the permanent monitoring probes go. If it found the hot spot at the top rack by the west wall, that is where a probe belongs, not on a column at eye level because it is easy to read there.

The HVAC design is a good first guide: the heat loads that sized the cooling also create the worst positions.

Seasons matter too. In southern Viet Nam the swing is less about winter and more about roof solar gain and the wet season, so the protocol should say which conditions the map covers.

Where did your last map find the warmest position?

Industries

Related

More on this subject

Containment exhaust fans, stacks and intakes

Put containment exhaust fans at the end of the run so ducts inside the building stay negative. Run duty and standby with isolation dampers and alarmed changeover, discharge vertically with height and velocity from a standard or a dispersion study, and keep the plume away from fresh-air intakes.

InsightRead