Whether a product can be terminally sterilised sets the grade of the filling room, and with it most of a sterile line's HVAC cost.
For a terminally sterilised product, the sterilisation cycle carries the sterility assurance. Filling still has to keep bioburden and particles down before the cycle, typically in Grade C, with the exact grade argued in the Contamination Control Strategy. The cascade is shorter and qualification centres on classification, pressure and the cycle itself.
For an aseptically filled product there is no cycle after filling. Everything the product touches after sterile filtration is exposed in Grade A, either in an open or RABS line with a Grade B background, or inside an isolator. That brings unidirectional airflow over the filling zone, continuous particle monitoring, more airlocks and gowning steps, and aseptic process simulations.
It shows up in AHU sizes, ceiling filter coverage, the number of rooms in the cascade and the length of the qualification program. The sterilisation route is a design input for the HVAC and has to be fixed before the layout is drawn. Annex 1 expects terminal sterilisation to be chosen where the product allows it, and the CCS has to explain the choice either way.
We use the CCS as the organizing document for sterile facilities, so this decision is written down before the first airflow is calculated.