Skip to content

Life Sciences

Why hospital isolation and operating rooms work from 2.5 Pa

  • Life Sciences
  • 1 min read

Pharma HVAC engineers expect 10 to 15 Pa at a door. The hospital standard asks for 2.5.

In GMP cleanrooms 10 to 15 Pa between adjacent grades is the usual design range. ANSI/ASHRAE/ASHE Standard 170, the ventilation standard widely used for health care facilities, sets a minimum of 0.01 inch of water, about 2.5 Pa, for rooms such as airborne infection isolation rooms, protective environment rooms and operating rooms. That is a quarter of the lower GMP figure.

The door explains much of it. A hospital door is wide, opens for beds many times an hour and has to be easy to push. The standard protects the direction of the air through the gaps of a closed door, and a small steady offset between supply and exhaust is enough for that.

It is also much easier to lose. Wind on the building, a lift moving in its shaft or a corridor door left open can each shift the pressure in a room by more than 2.5 Pa. So the details pharma treats as secondary carry the design here: door closers that really close, a drop seal under the door, sealed ceiling penetrations.

The monitor matters too: a transmitter ranged for a 15 Pa cascade may not measure 2.5 Pa with any confidence.

Hospital clean zones, from operating theatres to isolation rooms, are part of our life sciences work.

Talk to an engineer: contact@humiley.com · +84 28 7777 6668 (Viet Nam office)

Industries

Related

More on this subject

Zoning and Pressure Cascade

In pharmaceutical facility design, if the HVAC system is the "lungs," then the Zoning and Pressure Cascade strategy is the "immune system." It creates invisible but effective barriers that prevent microbial ingress and strictly control…

InsightRead