Ten years of batches at the sending site do not validate the process at the receiving site.
"The process is already validated" is heard in many transfer kick-off meetings. It was validated, at a site with different equipment, utilities, operators and procedures.
The WHO guideline on technology transfer (TRS 1044, Annex 4) leaves little room on who does the work. It defines validation batches as those produced by the receiving unit to demonstrate its ability to manufacture the transferred product.
EU GMP Annex 15 (2015) lists site transfers among the cases its process validation section covers. For a transferred product it says the number of validation batches could be reduced by a bracketing approach (testing only the extremes of factors such as strength or batch size), and that existing product knowledge, including the content of the previous validation, should be available.
Cleaning does not travel either. The WHO text says cleaning procedures and their validation should normally be site specific.
The sending unit's validation report therefore goes into the transfer package as an input: it supports the design of the receiving unit's protocol and gives the new results a baseline.