Module 3 of an EU dossier is a description of your plant, and the inspector reads it before walking the corridor.
The Common Technical Document (ICH M4) has five modules. Modules 1, 2, 4 and 5 hold regional administration, summaries and the nonclinical and clinical reports. Module 3 is Quality: the manufacturing process, the controls on critical steps, process validation and, for many products, the facilities and equipment behind them.
HVAC and utilities turn up in that text. A filling step is described with its room grade, a formulation with its water grade, and a bulk hold time with the temperature and humidity of the room where the bulk waits. After approval, changing any of it generally means a variation.
The usual failure is two teams writing about one building on different schedules. Regulatory drafts Module 3 from the process description while engineering is still moving walls. Months later the dossier says Grade C, the approved layout puts the step in Grade D, and someone has to decide whether that is a variation or a correction.
One table of room grades, water grades and environmental limits, used for both the dossier and the design basis, avoids most of this. When a room changes grade, the table changes first and both teams hear the same day.
Humiley's EU-GMP roadmap consulting covers the CTD/eCTD dossier as well as the facility design.
Industries