Annex 15 describes three approaches to process validation

  • Life Sciences
  • 1 min read

"Three batches" sits in a single clause of EU GMP Annex 15 (2015), under one of the three approaches it gives for validating a process.

Section 5 of the 2015 text counts the approaches itself: traditional, continuous and hybrid.

In the traditional approach a number of batches are manufactured under routine conditions. The manufacturer must determine and justify how many. This is where three comes in: a minimum of three consecutive batches is, in the annex's words, generally considered acceptable.

Continuous process verification can be used instead for products developed by a quality by design approach, where development has established that the control strategy gives a high degree of assurance of product quality. Between the two, a hybrid could be used where there is substantial product and process knowledge from manufacturing experience.

Whichever is chosen, ongoing process verification should be used throughout the product lifecycle, and the equipment, facilities, utilities and systems used for process validation should be qualified.

Most plants will stay with the traditional approach, and for an established tablet process that is a sound choice. The other two make one question worth asking before the protocol is drafted: how much of the assurance is already in the development and manufacturing data.

Industries

Related

More on this subject

The receiving site validates the process again

A process validated at the sending site was validated with that site's equipment, utilities and people. WHO's technology transfer guideline defines validation batches as those produced by the receiving unit, and EU GMP Annex 15 (2015) covers site transfers. The earlier validation supports the new protocol. With bracketing, the number of batches could be reduced; the content of the previous validation should be available.

InsightRead

Qualification comes before the registration batches

On the road to registration, facility, utility and equipment qualification sits before the registration batches: fix products and markets in the design basis, qualify, make the batches on qualified equipment, run stability and submit. Where process validation and the inspection fall depends on the region and the process. A delay in PQ moves the earliest submission date.

InsightRead